Which stages should a Fraser Rise owner prioritise?
Frame first, then slab, then the handover. Frame is where we keep finding load paths that do not match the engineering, and it is lined within days.
Can I add stages after the build has started?
Yes. Book whichever stages are still ahead of you. We note in the first report that earlier work was already covered and could not be assessed.
Does the builder need to agree to an independent inspector?
You own the land and the home being built, and no standard Victorian domestic building contract shuts out your own consultant. We arrange access with the supervisor and keep out of the trades' way.
What sits outside a stage inspection?
We do not test or energise services, take soil or concrete samples, or certify footings and framing. Where a fix needs design, the report says an engineer should sign it off.